1.Wall Requirement

The wall should be strong and flat, surface be smooth. The wall should be waxed / printed. Wall should be clean and dry, if the tiling has to be done on plywood the surface of wall should be sealed with 50% volume mixture of PVA and water.

2.Tiles Preparation

Mix the tiles from different cartoons which will help in fine blending of shades.

3.Tiles Laying

Firstly, apply the high quality ceramic adhesive on the wall and place the first tile on the corner. Apply even pressure on the four corner of the tile to ensure sticking. Fill the area of wall that can be filled with the tiles without cutting and leave it for at least 12 hours. Fill the rest of area with the measures and cut tiles.

4.Tamping Process

To ensure the proper contact of tile with the wall, evenly tamp the tiles with a rubber mallet tamp.

5.Applying Grout

On the next day, the grouting is done. Apply the grout diagonally between the tiles using a sponge to fill the gaps between the tiles. Clean and wipe the surplus grout with a sponge.

6.Curve Cutting

To ensure the proper contact of tile with the wall, evenly tamp the tiles with a rubber mallet tamp.

7.Hole Cutting

To pass a pipe through the tile, the tile has to be cut in a specific manner. Mark the position on the tile. Which the tile will occupy. Draw a straight line passing through the center of the circle. Cut the tile on the drawn. Cut the seml-clrcles on each of the half and when these 1wo halves placed together will from a hole.

8.Window Recess Tiling And Cutting

Tile has to be cut In T shape for window recess. Cut a line from center to edge and than draw a right angle line vertical down. Cut the line to get on T shape that can fit in a window.

9.Accessory Tile Fitting

While laying the normal tiles, keep an empty space where a accessory tiles will be fit. Apply the adhesive on the back of accessory tiles and place it uniformly in the space and apply even pressure to place the accessory tile.

10.Tile Drilling

Apply masking tape to cover the area to be drilling. Mark the position of hole and drill the hole with lowest possible pressure on the drill.